Skip to main content
615 Sod, sod installation and sod grass for lawns in Nashville TN 615-431-3789

Sod Installation

New construction sod that finishes a new home's yard properly, on builder-graded soil that is prepared for real grass

New homes often come with compacted clay, rock and construction debris. We clean it up, prepare the soil and lay sod that actually roots.

Call or text today615-431-3789

Request sod service

Tell us what is going on. We will contact you to confirm the details and set up a time to look at the job.

Or call 615-431-3789

By sending this you agree that we may contact you about your project. See our Privacy Policy.

Prefer to type? Text your request to 615-431-3789

New Construction Sod

A new home deserves a yard that looks finished, but builder-graded lots are rarely ready for grass. The soil is compacted by equipment, mixed with rock, clay and debris, and graded only roughly. Laying sod straight on that surface often leads to poor rooting, dry spots and drainage problems.

We install sod for new construction across Middle Tennessee, including Nashville-area subdivisions and custom homes. We coordinate timing with the builder, clear debris, rework the grade, add topsoil or compost where needed and lay sod after final grading, so the lawn starts strong.

What you get

Done right, from the first call

01

Builder coordination

We schedule around final grading, landscaping and closing dates.

02

Debris and rock removal

Construction waste, stone and roots are cleared from the lawn area.

03

Topsoil and amendments

Compost or topsoil added to improve poor subsoil.

04

Final grade

A smooth, drained surface that carries water away from the home.

The process

How your service comes together

  1. 1

    Review the lot

    We walk the lot and confirm grade, soil and timing.

  2. 2

    Prepare the soil

    We clear, grade and amend the lawn area.

  3. 3

    Lay the sod

    We install sod and start the watering plan.

FAQ

Common questions about new construction sod

Can you work with my builder?

Yes. We coordinate timing so sod goes down after final grading and other trades are finished.

Is builder soil good enough for sod?

Usually it needs help. We test, add topsoil or compost where needed and prepare the surface.

When should sod go in on a new build?

After final grading and heavy work are done, and ideally when the weather suits the grass type.

Let us help with your new construction sod

Call, text or send the form. Tell us about your yard and we will take it from there.

615-431-3789Text